Completed Projects
74. BATANG KALI, ULU YAM
Project Title | CADANGAN MEMBINA 70 UNIT RUMAH TERES 3 TINGKAT SKIM GUARDED (NON STRATA) DI ATAS TANAH LOT340, MUKIM ULU YAM, DAERAH HULU SELANGOR, MAJLIS DAERAH HULU SELANGOR, BAGI TETUAN: KAYUMANIS DEVELOPMENT SDN BHD. |
Project Completed Year | 2017 |
Main Contractor | HIGH RISE MILLENNIUM SDN BHD |
73. PANTAI KAMPUNG TANJUNG LUMPUR, KUANTAN.
Project Title | CADANGAN PEMBANGUNAN PANGSAPURI PERKHIDMATAN 2 BLOK 29 TINGKAT DI ATAS TANAH KERAJAAN DI PERSIARAN PANTAI KAMPUNG TANJUNG LUMPUR, MUKIM KUALA KUANTAN. |
Project Completed Year | 2017 |
Main Contractor | SHUN MAO SDN BHD |
72. SIMPANG PULAI
Project Title | CADANGAN MEMBINA 304 UNIT RUMAH TERES DUA TINGKAT DI ATAS PT 40001 (PLOT 1) - PT 40155 (PLOT 155, PT 40157 (PLOT 157) - PT 40305 (PLOT 305) DAN 1 UNIT RUMAH BANGLO DUA TINGKAT DI ATAS PT 40156 (PLOT 156), DI ATAS SEBAHAGIAN LOT 18229, FASA 7.3(1), BANDAR SERI BOTANI, MUKIM SUNGAI TERAP, DAERAH KINTA, PERAK DARUL RIDZUAN. |
Project Completed Year | 2017 |
Main Contractor | HIGH RISE MILLENNIUM SDN BHD. |
71. COUNTRY HEIGHTS DAMANSARA, MUKIM BATU KUALA LUMPUR
Project Title | CADANGAN MEMBINA SEBUAH RUMAH BANGLO KORPORAT 4 TINGKAT BERSERTA DUA TINGKAT BASEMEN, KOLAM RENAGN DAN KERJA-KERJA INFRASTRUKTUR TERMASUK TEMBOK PENAHAN DI ATAS LOT-LOT 250, 251, 252, 253, 445, 445, 447, 448, 449, 464, 465 DAN LOT 466 JALAN SALAM 1, COUNTRY HEIGHTS DAMANSARA, MUKIM BATU 52000 KUALA LUMPUR UNTUK TETUAN GOH PENG OOI DAN TONG NGUK PING. |
Project Completed Year | 2017 |
Main Contractor | TOTAL TEAMWORK SDN BHD |
70. KEM DESA PAHLAWAN
Project Title | CADANGAN PEMBANGUNAN 384 UNIT RUMAH KELUARGA, ANGKATAN TENTERA (RKAT) KELAS G DI KEM DESA PAHLAWAN, KOK LANAS, KOTA BHARU, KELANTAN SECARA REKA DAN BINA (KEM DESA PAHLAWAN). |
Project Completed Year | 2017 |
Main Contractor | DOMAIN RESOURCES SDN BHD |
69. MON'T KIARA, MUKIM BATU KUALA LUMPUR
Project Title | CADANGAN PEMBANGUNAN YANG MENGANDUNGI: A) BLOCKA - 1BLOCK PANGSAPURI 31 TINGKAT (234 UNIT), BLOCK B - 1 BLOCK PANGSAPURI 31 TINGKAT (220 UNIT), BLOCK C - 1 BLOCK PANGSAPURI 30 TINGKAT (168 UNIT), KEMUDAHAN RUMAH KELAB, RESTORAN DAN TADIKA DI BLOK B DAN KOLAM RENANG DI ARAS BAWAH, SURAU (BASEMENT 1), 4 TINGKAT BASEMEN TEMPAT LETAK KERETA. DI ATAS LOT 67210 (G70960), JALAN DUTA KIARA, MON'T KIARA, MUKIM BATU KUALA LUMPUR UNTUK TETUAN PERMATA CERMAT SDN BHD. |
Project Completed Year | 2017 |
Main Contractor | CRCC MALAYSIA BERHAD |
68.
Project Title | CADANGAN 90 UNIT RUMAH BANDAR 2 TINGKAT DI ATAS PT LOT 27756 – PT LOT 27920 @ DENGKIL, DAERAH SEPANG, SELANGOR DARUL EHSAN. |
Project Completed Year | 2013 |
Main Contractor | ACTIVATE ENGINEERING SDN.BHD. |
67.
Project Title |
CADANGAN 58 UNIT PEMBANGUNAN PERINDUSTRIAN YANG MENGANDUNGI :
|
Project Completed Year | 2012 |
Main Contractor | MITC ENGINEERING SDN.BHD. |
66.
Project Title | CADANGAN PEMBAGUNAN BAGI MEMBINA 200 UNIT RUMAH TERES 1 TINGKAT DAN SEBUAH PENCAWANG ELEKTRIK DI ATAS SEBAHAGIAN LOT 20411 SELUAS 231.55 EKAR, MUKIM TANJUNG DUA BELAS, DAERAH KUALA LANGAT, SELANGOR DARUL EHSAN. |
Project Completed Year | 2012 |
Main Contractor | MITC ENGINEERING SDN.BHD. |
65.
Project Title |
CADANGAN 78 UNIT KEDAI PEJABAT 2 TINGKAT KEPADA 78 UNIT KEDAI PEJABAT YANG MENGANDUNGI :
|
Project Completed Year | 2012 |
Main Contractor | MITC ENGINEERING SDN.BHD. |
64.
Project Title | PROPOSED CONSTRUCTION AND COMPLETION OF 157 UNITS DOUBLE STOREY TERRACE HOUSE TYPE B (SIZE 22’ X 75’), 1 UNIT TNB SUB-STATION AND OTHER RELATED INFRASTRUCTURE WORKS AT PHASE 7A, NUSA IDAMAN, NUSAJAYA. |
Project Completed Year | 2012 |
Main Contractor | TOTAL TEAMWORK CONSTRUCTION SDN.BHD. |
63.
Project Title | CADANGAN MEMBINA DAN MENYIAPKAN 62 UNIT RUMAH TERES 2 TINGKAT DI FASA 7, DI ATAS SEBAHAGIAN LOT PTD 72263, EAST LEDANG, NUSAJAYA, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM. |
Project Completed Year | 2012 |
Main Contractor | TANGAWARIS SDN.BHD. |
62.
Project Title | CADANGAN MEMBINA 78 UNIT RUMAH TERES JENIS A, 2 TINGKAT 1450SQF, 52 UNIT RUMAH TERES JENIS B, 2 TINGKAT 1350SQF DAN 1 UNIT PENCAWANG ELEKTRIK DI ATAS SEBAHAGIAN LOT PTD 71040, FASA 3B, PARCEL I-ONE (NUSA BAYU), BANDAR NUSAJAYA. MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR. |
Project Completed Year | 2011 |
Main Contractor | PEMBINAAN DAFA SDN.BHD. |
61.
Project Title | CADANGAN PEMBINAAN PERUMAHAN YANG MENGANDUNGI 348 UNIT RUMAH TERES SATU TINGKAT (RTI) DI ATAS PLOT C (231.55 EKAR) DI SEBAHAGIAN LOT PT 23418, MUKIM TANJUNG DUA BELAS, DAERAH KUALA LANGAT, SELANGOR.MUKIM TANJUNGDUA BELAS,DAERAH KUALA LANGAT, SELANGOR. |
Project Completed Year | 2011 |
Main Contractor | MITC ENGINEERING SDN.BHD. |
60.
Project Title | CADANGAN MEMBINA DEWAN SERBAGUNA 3 TINGKAT SERTA BLOK BANGUNAN BARU 5 TINGKAT YANG DICANTUM DENGAN 5 TINGKAT BANGUNAN SEDIA ADA DI ATAS LOT 1231, SJK (CINA) CHUNG KWO, JALAN CHIN CHIN, OFF JALAN LOKE YEW, SEKSYEN 69, KUALA LUMPUR. |
Project Completed Year | 2011 |
Main Contractor | YWC ENGINEERS & CONSTRUCTORS SDN BHD. |
59.
Project Title | PACKAGE 3B THE CONSTRUCTION, COMPLETION & MAINTENANCE FOR 26 UNITS SEMI-DETACHED FACTORIES AT PHASE 1A, NUSA CERMELAMG INDUSTRIAL PARK, BANDAR NUSAJAYA, DAERAH JOHOR BAHRU FOR M/S PANORAMIC INDUSTRIAL DEVELOPMENT SDN BHD. |
Project Completed Year | 2011 |
Main Contractor | REPUTE CONSTRUCTION SDN.BHD. |
58.
Project Title | PROPOSED DEVELOPMENT OF “ONE CITY” ( PHASE 1 ) 63 UNITS OF “ GARDEN SHOPPE “ AT USJ 25, SUBANG JAYA, MUKIM DAMAMSARA, DAERAH PETALING, SELANGOR DARUL EHSAN FOR ONE CITY PROPERTIES SDN BHD. |
Project Completed Year | 2011 |
Main Contractor | MODULAR CONSTRUCTION TECHNOLOGY SDN. BHD. |
57.
Project Title |
CADANGAN PEMBANGUNANPERDAGANGAN YANG MENGANDUNGI : -
|
Project Completed Year | 2011 |
Main Contractor | MODULAR CONSTRUCTION TECHNOLOGY SDN. BHD. |
56.
Project Title | UITM CAWANGAN MELAKA, KAMPUS ALOR GAJAH – PEMBINAAN KOMPLEKS ASMARA DAN BENGKEL FSSR. |
Project Completed Year | 2011 |
Main Contractor | MAWEST ENGINEERING SDN. BHD. |
55.
Project Title | CADANGAN PEMBANGUNAN SEMULA KEM BATALION 8, PASUKAN GERAKAN AM (PGA) PENGKALAN CHEPA, POLIS DIRAJA MALAYSIA DIATAS LOT 1972, SEK 39, MUKIM KEMUMIN, DAERAH KEMUMIN, KOTA BAHRU, KELANTAN. (PAKEJ 2 ) |
Project Completed Year | 2011 |
Main Contractor | ELITE FORTE CONSTRUCTION SDN. BHD. |
54.
Project Title | PEMBINAAN PUSAT LATIHAN TEKNOLOGI TINGGI (ADTEC) JERANTUT, PAHANG DARUL MAKMUR. |
Project Completed Year | 2011 |
Main Contractor | SM PELANGI SDN BHD |
53.
Project Title | CADANGAN MEMBINA DAN MENYIAPKAN 24 UNIT RUMAH TERES SETINGKAT DIATAS PETAK 1-24 DAN 28 UNIT RUMAH 2 TINGKAT DI ATAS PETAK 25-52, DIATAS PECAHAN LOT-LOT 1494, 1496, 1498 DAN 1950, MUKIM TELOK, DAERAH PANJI, JAJAHAN KOTA BAHRU, KELANTAN. |
Project Completed Year | 2010 |
Main Contractor | ELITE FORTE CONSTRUCTION SDN. BHD. |
52.
Project Title | CADANGAN MEREKABENTUK,MEMBINA,MENYIAPKAN DAN MENGUJI TAULIAH PEMBANGUNAN IBU PEJABAT POLISDAERAH )IPD) BERSERTA KOMPONENNYA DAN 170 UNIT KUARTERS KEDIAMAN,DIATAS LOT PTD 102842, MUKIM KULAI, DAERAH KULAI JAYA, JOHOR DARUL TAKZIM UNTUK TETUAN KEMENTERIAN DALAM NEGERI. |
Project Completed Year | 2010 |
Main Contractor | SRJ BINA SDN BHD |
51.
Project Title | THE DESIGN, CONSTRUCTION, EQUIPPING COMMISSIONING AND MAINTENANCE OF KOLEJ KEJURURAWATAN KUALA PILAH, NEGERI SEMBILAN – PHASE 2. |
Project Completed Year | 2010 |
Main Contractor | NS CONSTRUCTION SDN. BHD. |
50.
Project Title | CADANGAN PEMBANGUNAN PERUMAHAN DAN PENGINDAHAN PERSISIRAN SUNGAI KELANTAN ( ZON D ) YANG MENGANDUNGI BANGUNAN KEDAI DAN PEJABAT 3 TINGKAT JENIS “A” 384 UNIT DIATAS LOT PT379 – PT502, SEK.17, BANDAR KOTA BAHRU , KELANTAN. |
Project Completed Year | 2010 |
Main Contractor | ELITE FORTE CONSTRUCTION SDN. BHD. |
49.
Project Title | CADANGAN MEMBINA DAN MENYIAPKAN 2 TINGKAT BANGUNAN PEJABAT TAMBAHAN (ANNEXE) DAN MENGUBAHSUAI, BANGUNAN 2 TINGKAT SEDIADA, DIATAS LOT 1552, KG JAYA INDUSTRIAL AREA MUKIM BATU, DAERAH GOMBAK UNTUK TETUAN TASEK CORPORATION BERHAD. |
Project Completed Year | 2010 |
Main Contractor | DIAN MAKMUR SDN.BHD. |
48.
Project Title | KUALA LUMPUR GOLF & COUNTRY. |
Project Completed Year | 2009 |
Main Contractor | JUTERAS VISION SDN.BHD. |
47.
Project Title | JALAN TUN RAZAK 20TH FLOOR SERVICE APARTMENT. |
Project Completed Year | 2009 |
Main Contractor | YWC ENGINEERING & CONTRACTOR SDN.BHD. |
46.
Project Title | PUCHONG 16TH FLR SERVICE APARTMENT (1016 units). |
Project Completed Year | 2009 |
Main Contractor | CONTRAMEC SDN.BHD. |
45.
Project Title | SIN CHEW DAILY EXISTING 2FLOOR OFFICE. |
Project Completed Year | 2008 |
Main Contractor | YWC ENGINEERING & CONTRACTOR SDN.BHD. |
44.
Project Title | SUBANG USJ ONE AVENUE CONDOMINIUM PHASE 1 & PHASE 2. |
Project Completed Year | 2008 |
Main Contractor | MODULER TECHNOLOGY CONSTRUCTION SDN.BHD. |
43.
Project Title | MID VALLY CITY DEVELOPMENT PHASE 2-PODIUM BLOCK THE GARDEN. |
Project Completed Year | 2007 |
Main Contractor | SHIMIZU. |
42.
Project Title | 194 UNITS DOUBLE-STOREY TERRACE HOUSE, MUKIM TANJUNGDUA BELAS, DAERAH KUALA LANGAT, SELANGOR. |
Project Completed Year | 2006 |
Main Contractor | MITC ENGINEERING SDN.BHD. |
41.
Project Title | JALAN ROBISON 20TH FLOOR SERVICE APARTMENT. |
Project Completed Year | 2006 |
Main Contractor | MUTIARA JOHAN GROUP. |
40.
Project Title | 800 UNITS MEDIUM COSTAPARTMENT AT LOT 18337, MUKIM TANJUNGDUA BELAS,DAERAH KUALA LANGAT, SELANGOR. |
Project Completed Year | 2005 |
Main Contractor | MITC ENGINEERING SDN.BHD. |
39.
Project Title | DESIGN, BUILD AND COMPLETE BUILDING AND INFRASTRUCTURE FOR CADANGAN MEMBINA DAN MENYIAPKAN (PHASE A1) 28 OF 74 UNIT RUMAH BERKEMBAR 3 TINGKAT DAN 1 UNIT PENCAWANG ELETRICK DI ATAS PT43669-PT43742, SEBAHAGIAN LOT 13961, MUKIM DENGKIL, DAERAH SEPANG, SELANGOR DARUL EHSAN UNTUK ASTANA MODAL(M) SDN BHD |
Project Completed Year | 2004 - 2005 |
Main Contractor | MITC ENGINEERING SDN.BHD. |
38.
Project Title | DESIGN, BUIL AND COMPLETE PHASE 1(122 UNITS SUPERLINK HOUSE) FOR PERMOHONAN KEBENARAN MERANCANG BAGI PINDAAN CADANGAN PELAN SUSUNATUR PEMBANGUNAN PERUMAHAN DAN PERNIAGAAN (PROJECK USAHASAMA) DIATAS SEBAHAGIAN LOT 13961, KAMPUNG RASAU, SELUAS 175.00 EKAR, MUKIM DENGKIL DAERAH SEPANG, SELANGOR DARUL EHSAN. |
Project Completed Year | 2004 - 2005 |
Main Contractor | MITC ENGINEERING SDN.BHD. |
37.
Project Title | CADANGAN PEMBAGUNAN PUSAT REHABILITASI DI ATAS SEBAHAGIAN LOT PT7263 [HS (D) 18923], MUKIM DURIAN TUNGGAL, DAERAH ALOR GAJAH, MELAKA. |
Project Completed Year | 2004 - 2005 |
Main Contractor | CCN CONSTRUCTION SDN.BHD. |
36.
Project Title | CADANGAN MEREKABENTUK, MEMBINA, MENYIAPKAN, MENGUJITERIMA, MENTUALAH DAN MENYELENGGARA INSTITUT KANSER NEGARA PUTRAJAYA. |
Project Completed Year | 2004 - 2005 |
Main Contractor | GREAT SUCCESS CONSTRUCTION SDN.BHD. |
35.
Project Title | 4 UNITS 3 STOREY SEMI-D FACTORY, 20 UNITS 3 STOREY CLUSTER DETACHED FACTORY. |
Project Completed Year | 2004 - 2005 |
Main Contractor | LBE BINA SDN.BHD. |
34.
Project Title | CADANGAN MEMBINA DAN MENYIAPKAN 33 UNITS RUMAH YANG TERDIRI DARI 11 UNITS RUMAH SESEBUAH 2 TINGKAT JENIS A, 13 UNIT RUMAH SESEBUAH JENIS B DAN 9 UNIT RUMAH SESEBUAH 2 TINGKAT JENIS C TERMASUK 1 UNIT PENCAWANG ELETRIK “SINGLE CHAMBER” DI ATAS SEBAHAGIAN LOT PTD 72263, EAST LEDANG, NUSAJAYA, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM. |
Project Completed Year | 2004 - 2005 |
Main Contractor | TOTAL TEAMWORK CONSTRUCTION SDN.BHD. |
33.
Project Title | PROPOSED CONSTRUCTION, COMPLETION AND MAINTENANCE OF CIVIL, STRUCTURAL AND BUILDING WORKS FOR 12UNITS SEMI-D FACTORIES(SD40), 8UNITS SEMI-D FACTORIES(SD60A/SD60AC), 8UNITS SEMI-D FACTORIES(SD80) AT PHASE 1A, NUSA CEMERLANG INDUSTRIAL PARK, BANDAR NUSAJAYA, DAERAH JOHOR BAHRU, JOHOR D.T. |
Project Completed Year | 2004 - 2005 |
Main Contractor | TIMOR JAYA CORPORATION SDN.BHD. |
32.
Project Title | CADANGAN MEMBINA DAN MENYIAPKAN 8 UNITS KEDAI/PEJABAT 3 TIMGKAT, DI ATAS LOT PT 1085-PT 1092, SEKSYEN 49, MUKIM LANGGAR, DAERAH KUBANG KERIAN, JAJAHAN KOTA BHARU, KELANTAN DARUL NAIM. |
Project Completed Year | 2004 - 2005 |
Main Contractor | ELITE FORTE CONSTRUCTION SDN.BHD. |
31.
Project Title | CADANGAN MEMBINA DAN MENYIAPKAN 9 UNITS KEDAI/PEJABAT 3 TINGKAT, DI ATAS LOT 615,111,112 DAN 113 SEKSYEN 26, BANDAR KOTA BHARU, JAJAHAN KOTA BHARU, KELANTAN DARUL NAIM. |
Project Completed Year | 2004 - 2005 |
Main Contractor | ELITE FORTE CONSTRUCTION SDN.BHD. |
30.
Project Title | CADANGAN PEMBANGUNAN PERUMAHAN DAN PENGINDAHAN PERSISIRAN SUNGAI KELANTAN (ZON A) YANG MENGANDUNGI BANGUNAN KEDAI DAN PEJABAT 3 TIMGKAT JENIS “A” 55 UNIT DIATAS LOT PT438-PT492, SEKSYEN 17, BANDAR KOTA BHARU, KELANTAN. |
Project Completed Year | 2004 - 2005 |
Main Contractor | ELITE FORTE CONSTRUCTION SDN.BHD. |
29.
Project Title | PROPOSED CONSTRUCTION AND COMPLETION OF DOUBLE STOREY CLUSTER HOUSE TYPE C1; 8 UNITS OF THREE STOREY CLUSTER HOUSE TYPE C2; 16 UNITS OF THREE STOREY CLUSTER HOUSE TYPE C3; 16 UNITS OF THREE STOREY CLUSTER HOUSE TYPE C3A; 6 UNITS OF THREE STOREY SEMI-DETACHED HOUSE TYPE D1; 12 UNITS OF THREE STOREY SEMI-DETACHED HOUSE TYPE D; 1 UNIT OF DOUBLE CHAMBER TNB SUB-STATION; AT PHASE 9F, TAMAN DESA TEBRAU, MUKIM TEBRAU, JOHOR BHARU, JOHOR DARUL TAKZIM. |
Project Completed Year | 2004 - 2005 |
Main Contractor | TOTAL TEAMWORK CONSTRUCTION SDN.BHD. |
28.
Project Title | CADANGAN MEMBINA DAN MENYIAPKAN RUMAH TERES 2 TINGKAT DAN 1 TINGKAT MUKIM BATU MENGKEBANG DAERAH KUALA KRAI KELANTAN DARUL IMAN. |
Project Completed Year | 2004 - 2005 |
Main Contractor | ELITE FORTE CONSTRUCTION SDN.BHD. |
27.
Project Title |
PROPOSED CONSTRUCTION, COMPLETION AND MAINTENANCE OF :-
|
Project Completed Year | 2004 - 2005 |
Main Contractor | REPUTE CONSTRUCTION SDN.BHD. |
26.
Project Title | CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH SERVIS APARTMENT 23 TINGKAT YANG MENGANDUNGI 2 TINGKAT TEMPAT LETAK KERETE ARAS BAWAH TANAH, 4 TINGKAT TEMPAT LETAK KERETA DAN 19 TINGKAT YANG MENGANDUNGI 102 UNIT KEDIAMAN DI ATAS LOT 114 & PT 547, SEKSYEN 50, MUKIM BAYANG, KAMPUNG CHERANG, DAERAH PANJI, JAJAHAN KOTA BAHRU, KELANTAN. |
Project Completed Year | 2004 - 2005 |
Main Contractor | ELITE FORTE CONSTRUCTION SDN.BHD. |
25.
Project Title |
CADANGAN MEMBINA :
|
Project Completed Year | 2004 - 2005 |
Main Contractor | PEMBINAAN DAFA SDN.BHD. |
24.
Project Title | 38 UNITS DOUBLE STOREY SEMI-D BANDAR SRI BOTANI, SIMPANG PULAI, PERAK. |
Project Completed Year | 2004 - 2005 |
Main Contractor | HIGH RISE MILLEMMIUM SDN.BHD. |
23.
Project Title | DESIGN, BUILD AND COMPLETE BUILDING AND INFRASTRUCTURE FOR CADANGAN MEMBINA DAN MENYIAPKAN(PHASE A2,A3) 46 OF 74 UNIT RUMAH BERKEMBAR 3 TINGKAT DAN 1 UNIT PENCAWANG ELETRICK DI ATAS PT43669-PT43742, SEBAHAGIAN LOT 13961, MUKIM DENGKIL, DAERAH SEPANG, SELANGOR DARUL EHSAN UNTUK ASTANA MODAL(M) SDN BHD. |
Project Completed Year | 2004 - 2005 |
Main Contractor | MITC ENGINEERING SDN BHD |
22.
Project Title | CADANGAN PEMBANGUNAN UNTUK MENYIAPKAN PUSAT REHABILITASI PERKESO TERMASUK KERJA-KERJA LUARAN DI ATAS LOT PT 7263(H.S.CD18923), MUKIM DARUAN TUNGGAL, ALOR GAJAH, HANG TUAH JAYA MELAKA UNTUK TETUAN PERTUBUHAN KESELAMATAN SOSIAL (PERKESO). |
Project Completed Year | 2004 - 2005 |
Main Contractor | GREAT SUCCESS CONSTRUCTION SDN BHD |
21.
Project Title | 53UNITS OF SUPERLINK HOUSE FOR CADANGAN BARU PEMBANGUNAN 115 UNIT RUMAH JENIS ‘SUPERLINK’ 3 TINGKAT UNTUK FASA 2 YANG MENGANDUNGI 95 UNIT JENIS A (24’ X 100’), 20 UNIT JENIS B (24’X80’) DAN SEBUAH BANGUNAN PENGCAWANG ELEKTRIK SERTA SEBUAH RUMAH PAM DI ATAS SEBAHAGIAN LOT 13961, MUKIM DENGKIL, DAERAH SEPANG, SELANGOR DARUL EHSAN. |
Project Completed Year | 2004 - 2005 |
Main Contractor | MITC ENGINEERING SDN BHD |
20.
Project Title | PROPOSED BIOPHARMACEUTICAL MANUFACTURING FACILITY (PROJECT 1002) AT NUSAJAYA,JOHOR,MALAYSIA: INTERIOR & EXTERIOR WET WORKS AS PER TENDER PACKAGE C15A. |
Project Completed Year | 2004 - 2005 |
Main Contractor | SPEED MANAGE SDN BHD |
19.
Project Title | CADANGAN MEMBINA 52 UNIT KEDAI-PEJABAT 4 TINGKAT 23’X70’ (BLOK B1,B2,B3 & B4) DAN 2 UNIT RUMAH SAMPAH DI ATAS SEBAHAGIAN LOT PT 7718, DI PERUNCIT 12, BANDAR SETIA ALAM, SEKSYEN U13, 40170 SHAH ALAM, SELANGOR DARUL EHSAN UNTUK TANJONG WAHYU SDN BHD. |
Project Completed Year | 2004 - 2005 |
Main Contractor | YWC STRUCTURE SDN BHD |
18.
Project Title |
CADANGAN MEMBINA FASA 1 (BLOK C1,C2,D1,D2,C3,C4,D3,D4) :-
|
Project Completed Year | 2004 - 2005 |
Main Contractor | YWC STRUCTURES SDN BHD |
17.
Project Title | 60 UNITS OF SUPERLINK HOUSE FOR CADANGAN BARU PEMBANGUNAN 115 UNIT RUMAH JENIS ‘SUPERLINK’ 3 TINGKAT UNTUK FASA 2 YANG MENGANDUNGI 95 UNIT JENIS A (24’ X 100’), 20 UNIT JENIS B (24’X80’) DAN SEBUAH BANGUNAN PENGCAWANG ELEKTRIK SERTA SEBUAH RUMAH PAM DI ATAS SEBAHAGIAN LOT 13961, MUKIM DENGKIL, DAERAH SEPANG, SELANGOR DARUL EHSAN. |
Project Completed Year | 2004 - 2005 |
Main Contractor | MITC ENGINEERING SDN BHD |
16.
Project Title | CADANGAN MEMBINA 75 UNIT KEDAI-PEJABAT 4 TINGKAT 23’X70’ (BLOK A1,A2,A3,A4,A5,A6) DENGAN 1 TINGKAT SUB-BESMEN DAN 1UNIT PENCAWANG ELEKTRIK’DOUBLE CHAMBER’ DAN 1UNIT RUMAH SAMPAH DI ATAS SEBAHAGIAN LOT PT 7718, DI PERUNCIT 12, BANDAR SETIA ALAM, SEKSYEN U13, 40170 SHAH ALAM, SELANGOR DARUL EHSAN UNTUK TANJONG WAHYU SDN BHD. |
Project Completed Year | 2004 - 2005 |
Main Contractor | YWC STRUCTURE SDN.BHD. |
15.
Project Title | CADANGAN MEMBINA 52UNIT RUMAH TERES (20’X70’) SERTA 1 UNIT PONDOK PENGAWAL DIATAS LOT 23683 (8.844 EKAR),MUKIM SUNGAI BULOH,DAERAH PETALING,SELANGOR DARUL EHSANUNTUK TETUAN LAMAN BAYU SDN BHD. |
Project Completed Year | 2004 - 2005 |
Main Contractor | MAXPROM BINA SDN BHD |
14.
Project Title | CADANGAN MEROBOH DAN MEMBINA SEMULA SEBUAH RUMAH BANGLO 3 TINGKAT DENGAN 2 TINGKAT ARAS BAWAH TANAH BERSERTA SEBUAH KOLAM RENANG DI ATAS LOT 37902 & 37903 PERSIARAN NEGERI SEMBILAN UNTUK TETUAN TAN SRI DATO YAP SUAN. |
Project Completed Year | 2004 - 2005 |
Main Contractor | MAXPROM BINA SDN BHD. |
13.
Project Title |
CADANGAN PEMBANGUNAN PERUMAHAN YANG MENGANDUNGI:
|
Project Completed Year | 2004 - 2005 |
Main Contractor | HIGH RISE MILLENNIUM SDN. BHD. |
12.
Project Title |
CADANGAN PEMBANGUNAN 23 UNIT KILANG YANG MENGANDUNGI:
|
Project Completed Year | 2004 - 2005 |
Main Contractor | HIGH RISE MILLENNIUM SDN. BHD. |
11.
Project Title | 63 UNITS BANGALOW AT EAST LEDANG PHASE 4B1 & 4B2, JOHOR FOR UEM LAND BHD. |
Project Completed Year | 2004 - 2005 |
Main Contractor | TOTAL TEAMWORK SDN BHD |
10.
Project Title | CADANGAN MEMBINA DAN MENYIAPKAN 6 UNIT RUMAH BANGLO 3 TINGKAT (JENIS C1, C2, C3), 20 UNIT RUMAH BERKEMBAR 3 TINGKAT (JENIS A1, A2, A3) DAN 20 UNIT RUMAH BERKEMBAR 3 TINGKAT (JENIS B1, B2, B3) DI ATAS LOT PT 37343 (43875) – PT 37392 (43924) DI BANDAR BUKIT PUCHONG 2, MUKIM DENGKIL, DAERAH SEPANG, SELANGOR DARUL EHSAN UNTUK TETUAN BUKIT HITAM DEVELOPMENT SDN BHD. |
Project Completed Year | 2004 - 2005 |
Main Contractor | HIGH RISE MILLENNIUM SDN. BHD. |
9.
Project Title |
PROPOSED CONSTRUCTION AND COMPLETION OF 6 BLOCKS (117 UNITS ) OF 3 STOREY TOWNHOUSES (STRATA TITLE) WITH SEMI-BASEMENT CAR PARK CONSISTING OF :
|
Project Completed Year | 2004 - 2005 |
Main Contractor | TOTAL TEAMWORK SDN BHD |
8.
Project Title |
CADANGAN PEMBANGUNAN 2 BLOK PANGSAPURI (360 UNIT) DI ATAS 4 TINGKAT PODIUM TEMPAT LETAK KERETA YANG MENGANDUNGI:-
|
Project Completed Year | 2004 - 2005 |
Main Contractor | COMFORT PLUS SDN BHD |
7.
Project Title |
CADANGAN PEMBANGUNAN 2 BLOK PERNIAGAAN (396 UNIT) YANG MENGANDUNGI:
|
Project Completed Year | 2004 - 2005 |
Main Contractor | YWC STRUCTURES SDN BHD |
6.
Project Title | CADANGAN PEMBANGUNAN 1 BLOK PANGSAPURI 25 TINGKAT (95 UNIT) YANG MENGANDUNGI 1 TINGKAT SEPARA BASEMEN, KEMUDAHAN-KEMUDAHAN PENDUDUK, 3 TINGKAT BASEMEN, TEMPAT LETAK KERETA, 1 UNIT PENCAWANG ELEKTRIK . 1 UNIT PONDOK PENGAWAL DAN 1 UNIT TEMPAT PENGUMPULAN SAMPAH DI ATAS PT25735, JALAN 1/62A, BANDAR MANJALARA MUKIM BATU, KUALA LUMPUR UNTUK TETUAN RADIANT SYMPHONY SDN BHD. |
Project Completed Year | 2004 - 2005 |
Main Contractor | YWC STRUCTURES SDN BHD |
5.
Project Title | CADANGAN MEMBINA 18 UNIT 4 TINGKAT KEDAI PEJABAT BERSERTA DAN 2 BLOK 360 UNIT 22 TINGKAT PANGSAPURI SERVIS TERMASUK 5 TINGKAT LETAK KERETA BERTINGKAT DAN KEMUDAHAN-KEMUDAHAN PENDUDUK SEPERTI PEJABAT PENGURUSAN, DEWAN SERBAGUNA, TADIKA, SURAU DAN GIMNASIUM DI ATAS SEBAHAGIAN LOT 46890, MUKIM BATU, DAERAH GOMBAK, MAJLIS PERBANDARAN SELAYANG, BANDAR BARU SELAYANG UNTUK SELAYANG 18 SDN BHD. |
Project Completed Year | 2004 - 2005 |
Main Contractor | YWC STRUCTURES SDN BHD |
4.
Project Title | CADANGAN MEMBINA 4 BLOK PANGSAPURI KOS SEDERHANA 8 TINGKAT (416 UNIT) DAN 2 TINGKAT TEMPAT LETAK KERETA DI ATAS PT 2685, KAMPUNG RAJA, MUKIM ULU TELOM, DAERAH CAMERON HIGHLAND, PAHANG DARUL MAKMUR |
Project Completed Year | 2004 - 2005 |
Main Contractor | ELITE FORTE CONSTRUCTION SDN BHD |
3.
Project Title |
CADANGAN MENDIRIKAN 1 BLOK 419 UNIT PANGSAPURI PERKHIDMATAN 22 TINGKAT (BLOK ‘O’) YANG MENGANDUNGI :-
|
Project Completed Year | 2004 - 2005 |
Main Contractor | YWC STRUCTURES SDN BHD |
2.
Project Title |
CADANG PEMBANGUNAN 2 BLOK PANGSAPURI (360 UNIT) DI ATAS 4 TINGKAT PODIUM TEMPAT LETAK KERETA YANG MENGANDUNGI:-
|
Project Completed Year | 2004 - 2005 |
Main Contractor | COMFORT PLUS SDN BHD |
1.
Project Title | PROPOSED CONSTRUCTION & COMPLETION OF 134 UNITS OF DOUBLE STOREY TERRACE HOUSES ON PT 201664 - PT 201738, PT201744 - PT 201790, PT 201791/PT 32301 - PT 201802/PT 32312 AT PART OF PARCEL F, BANDAR SERI BOTANI, OFF JALAN GOPENG, IPOH. |
Project Completed Year | 2004 - 2005 |
Main Contractor | HIGH RISE MILLENNIUM. |