Completed Projects


74. BATANG KALI, ULU YAM
Project Title CADANGAN MEMBINA 70 UNIT RUMAH TERES 3 TINGKAT SKIM GUARDED (NON STRATA) DI ATAS TANAH LOT340, MUKIM ULU YAM, DAERAH HULU SELANGOR, MAJLIS DAERAH HULU SELANGOR, BAGI TETUAN: KAYUMANIS DEVELOPMENT SDN BHD.
Project Completed Year 2017
Main Contractor HIGH RISE MILLENNIUM SDN BHD

73. PANTAI KAMPUNG TANJUNG LUMPUR, KUANTAN.
Project Title CADANGAN PEMBANGUNAN PANGSAPURI PERKHIDMATAN 2 BLOK 29 TINGKAT DI ATAS TANAH KERAJAAN DI PERSIARAN PANTAI KAMPUNG TANJUNG LUMPUR, MUKIM KUALA KUANTAN.
Project Completed Year 2017
Main Contractor SHUN MAO SDN BHD

72. SIMPANG PULAI
Project Title CADANGAN MEMBINA 304 UNIT RUMAH TERES DUA TINGKAT DI ATAS PT 40001 (PLOT 1) - PT 40155 (PLOT 155, PT 40157 (PLOT 157) - PT 40305 (PLOT 305) DAN 1 UNIT RUMAH BANGLO DUA TINGKAT DI ATAS PT 40156 (PLOT 156), DI ATAS SEBAHAGIAN LOT 18229, FASA 7.3(1), BANDAR SERI BOTANI, MUKIM SUNGAI TERAP, DAERAH KINTA, PERAK DARUL RIDZUAN.
Project Completed Year 2017
Main Contractor HIGH RISE MILLENNIUM SDN BHD.

71. COUNTRY HEIGHTS DAMANSARA, MUKIM BATU KUALA LUMPUR
Project Title CADANGAN MEMBINA SEBUAH RUMAH BANGLO KORPORAT 4 TINGKAT BERSERTA DUA TINGKAT BASEMEN, KOLAM RENAGN DAN KERJA-KERJA INFRASTRUKTUR TERMASUK TEMBOK PENAHAN DI ATAS LOT-LOT 250, 251, 252, 253, 445, 445, 447, 448, 449, 464, 465 DAN LOT 466 JALAN SALAM 1, COUNTRY HEIGHTS DAMANSARA, MUKIM BATU 52000 KUALA LUMPUR UNTUK TETUAN GOH PENG OOI DAN TONG NGUK PING.
Project Completed Year 2017
Main Contractor TOTAL TEAMWORK SDN BHD

70. KEM DESA PAHLAWAN
Project Title CADANGAN PEMBANGUNAN 384 UNIT RUMAH KELUARGA, ANGKATAN TENTERA (RKAT) KELAS G DI KEM DESA PAHLAWAN, KOK LANAS, KOTA BHARU, KELANTAN SECARA REKA DAN BINA (KEM DESA PAHLAWAN).
Project Completed Year 2017
Main Contractor DOMAIN RESOURCES SDN BHD

69. MON'T KIARA, MUKIM BATU KUALA LUMPUR
Project Title CADANGAN PEMBANGUNAN YANG MENGANDUNGI: A) BLOCKA - 1BLOCK PANGSAPURI 31 TINGKAT (234 UNIT), BLOCK B - 1 BLOCK PANGSAPURI 31 TINGKAT (220 UNIT), BLOCK C - 1 BLOCK PANGSAPURI 30 TINGKAT (168 UNIT), KEMUDAHAN RUMAH KELAB, RESTORAN DAN TADIKA DI BLOK B DAN KOLAM RENANG DI ARAS BAWAH, SURAU (BASEMENT 1), 4 TINGKAT BASEMEN TEMPAT LETAK KERETA. DI ATAS LOT 67210 (G70960), JALAN DUTA KIARA, MON'T KIARA, MUKIM BATU KUALA LUMPUR UNTUK TETUAN PERMATA CERMAT SDN BHD.
Project Completed Year 2017
Main Contractor CRCC MALAYSIA BERHAD

68.
Project Title CADANGAN 90 UNIT RUMAH BANDAR 2 TINGKAT DI ATAS PT LOT 27756 – PT LOT 27920 @ DENGKIL, DAERAH SEPANG, SELANGOR DARUL EHSAN.
Project Completed Year 2013
Main Contractor ACTIVATE ENGINEERING SDN.BHD.

67.
Project Title CADANGAN 58 UNIT PEMBANGUNAN PERINDUSTRIAN YANG MENGANDUNGI :
  1. 58 UNIT BANGUNAN INDUSTRI BERKEMBAR 1 ½ TINGKAT [ 44UNIT JENIS ‘IBR 1A’ (60’X125’); 12 UNIT JENIS ‘IBR 1B’ (65X125’) & 2 UNIT JENIS ‘IBR 2’ (65’X125’) ] SERTA PONDOK PENGAWAL
  2. 2 UNIT PENCAWANG ELEKTRIK.
  3. 1 UNIT RUMAH PAM DI ATAS SEBAHAGIAN LOT 336 (PLOT A, B, C, DAN D) MUKIM DENGKIL, DAERAH SEPANG, SELANGOR DARUL EHSAN.
Project Completed Year 2012
Main Contractor MITC ENGINEERING SDN.BHD.

66.
Project Title CADANGAN PEMBAGUNAN BAGI MEMBINA 200 UNIT RUMAH TERES 1 TINGKAT DAN SEBUAH PENCAWANG ELEKTRIK DI ATAS SEBAHAGIAN LOT 20411 SELUAS 231.55 EKAR, MUKIM TANJUNG DUA BELAS, DAERAH KUALA LANGAT, SELANGOR DARUL EHSAN.
Project Completed Year 2012
Main Contractor MITC ENGINEERING SDN.BHD.

65.
Project Title CADANGAN 78 UNIT KEDAI PEJABAT 2 TINGKAT KEPADA 78 UNIT KEDAI PEJABAT YANG MENGANDUNGI :
  1. 12UNIT KEDAI PEJABAT 3 TINGKAT
  2. 66UNIT KEDAI PEJABAT 2 TINGKAT DI ATAS LOT PT 21339, BANDAR SAUJANA PUTRA, MUKIM TANJUNG DUA BELAS, DAERAH KUALA LANGAT, SELANGOR DARUL EHSAN.
Project Completed Year 2012
Main Contractor MITC ENGINEERING SDN.BHD.

64.
Project Title PROPOSED CONSTRUCTION AND COMPLETION OF 157 UNITS DOUBLE STOREY TERRACE HOUSE TYPE B (SIZE 22’ X 75’), 1 UNIT TNB SUB-STATION AND OTHER RELATED INFRASTRUCTURE WORKS AT PHASE 7A, NUSA IDAMAN, NUSAJAYA.
Project Completed Year 2012
Main Contractor TOTAL TEAMWORK CONSTRUCTION SDN.BHD.

63.
Project Title CADANGAN MEMBINA DAN MENYIAPKAN 62 UNIT RUMAH TERES 2 TINGKAT DI FASA 7, DI ATAS SEBAHAGIAN LOT PTD 72263, EAST LEDANG, NUSAJAYA, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM.
Project Completed Year 2012
Main Contractor TANGAWARIS SDN.BHD.

62.
Project Title CADANGAN MEMBINA 78 UNIT RUMAH TERES JENIS A, 2 TINGKAT 1450SQF, 52 UNIT RUMAH TERES JENIS B, 2 TINGKAT 1350SQF DAN 1 UNIT PENCAWANG ELEKTRIK DI ATAS SEBAHAGIAN LOT PTD 71040, FASA 3B, PARCEL I-ONE (NUSA BAYU), BANDAR NUSAJAYA. MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR.
Project Completed Year 2011
Main Contractor PEMBINAAN DAFA SDN.BHD.

61.
Project Title CADANGAN PEMBINAAN PERUMAHAN YANG MENGANDUNGI 348 UNIT RUMAH TERES SATU TINGKAT (RTI) DI ATAS PLOT C (231.55 EKAR) DI SEBAHAGIAN LOT PT 23418, MUKIM TANJUNG DUA BELAS, DAERAH KUALA LANGAT, SELANGOR.MUKIM TANJUNGDUA BELAS,DAERAH KUALA LANGAT, SELANGOR.
Project Completed Year 2011
Main Contractor MITC ENGINEERING SDN.BHD.

60.
Project Title CADANGAN MEMBINA DEWAN SERBAGUNA 3 TINGKAT SERTA BLOK BANGUNAN BARU 5 TINGKAT      YANG DICANTUM DENGAN 5 TINGKAT BANGUNAN SEDIA ADA DI ATAS LOT 1231, SJK (CINA) CHUNG KWO, JALAN CHIN CHIN, OFF JALAN LOKE YEW, SEKSYEN 69, KUALA LUMPUR.
Project Completed Year 2011
Main Contractor YWC ENGINEERS & CONSTRUCTORS SDN BHD.

59.
Project Title PACKAGE 3B THE CONSTRUCTION, COMPLETION & MAINTENANCE FOR 26 UNITS SEMI-DETACHED FACTORIES AT PHASE 1A, NUSA CERMELAMG INDUSTRIAL PARK, BANDAR NUSAJAYA, DAERAH JOHOR BAHRU FOR M/S PANORAMIC INDUSTRIAL DEVELOPMENT SDN BHD.
Project Completed Year 2011
Main Contractor REPUTE CONSTRUCTION SDN.BHD.

58.
Project Title PROPOSED DEVELOPMENT OF “ONE CITY” ( PHASE 1 ) 63 UNITS OF “ GARDEN SHOPPE “ AT USJ 25, SUBANG JAYA, MUKIM DAMAMSARA, DAERAH PETALING, SELANGOR DARUL EHSAN FOR ONE CITY PROPERTIES SDN BHD.
Project Completed Year 2011
Main Contractor MODULAR CONSTRUCTION TECHNOLOGY SDN. BHD.

57.
Project Title CADANGAN PEMBANGUNANPERDAGANGAN YANG MENGANDUNGI : -
  1. BLOK A, BLOK B, BLOK C, BLOK D KEDAI PEJABAT – 10 TINGKAT,
  2. MENARA PEJABAT – 15 TINGKAT, HOTEL – 12 TINGKAT, 3 TINGKAT TEMPAT LETAK KERETA ARAS BASEMENT
  3. 1 UNIT PENGCAWANG ELEKTRIK (DOUBLE CHAMBER PLOT 1576,
DI ATAS LOT 54445 DAN LOT 77027, MUKIM DAMAMSARA DAERAH PETALING, SELANGOR DARUL EHSAN UNTUK TETUAN ONE CITY PROPERTIES SDN BHD ( PHASE 2 ).
Project Completed Year 2011
Main Contractor MODULAR CONSTRUCTION TECHNOLOGY SDN. BHD.

56.
Project Title UITM CAWANGAN MELAKA, KAMPUS ALOR GAJAH – PEMBINAAN KOMPLEKS ASMARA DAN BENGKEL FSSR.
Project Completed Year 2011
Main Contractor MAWEST ENGINEERING SDN. BHD.

55.
Project Title CADANGAN PEMBANGUNAN SEMULA KEM BATALION 8, PASUKAN GERAKAN AM (PGA) PENGKALAN CHEPA, POLIS DIRAJA MALAYSIA DIATAS LOT 1972, SEK 39, MUKIM KEMUMIN, DAERAH KEMUMIN, KOTA BAHRU, KELANTAN. (PAKEJ 2 )
Project Completed Year 2011
Main Contractor ELITE FORTE CONSTRUCTION SDN. BHD.

54.
Project Title PEMBINAAN PUSAT LATIHAN TEKNOLOGI TINGGI (ADTEC) JERANTUT, PAHANG DARUL MAKMUR.
Project Completed Year 2011
Main Contractor SM PELANGI SDN BHD

53.
Project Title CADANGAN MEMBINA DAN MENYIAPKAN 24 UNIT RUMAH TERES SETINGKAT DIATAS PETAK 1-24 DAN 28 UNIT RUMAH 2 TINGKAT DI ATAS PETAK 25-52, DIATAS PECAHAN LOT-LOT 1494, 1496, 1498 DAN 1950, MUKIM TELOK, DAERAH PANJI, JAJAHAN KOTA BAHRU, KELANTAN.
Project Completed Year 2010
Main Contractor ELITE FORTE CONSTRUCTION SDN. BHD.

52.
Project Title CADANGAN MEREKABENTUK,MEMBINA,MENYIAPKAN DAN MENGUJI TAULIAH PEMBANGUNAN IBU PEJABAT POLISDAERAH )IPD) BERSERTA KOMPONENNYA DAN 170 UNIT KUARTERS KEDIAMAN,DIATAS LOT PTD 102842, MUKIM KULAI, DAERAH KULAI JAYA, JOHOR DARUL TAKZIM UNTUK TETUAN KEMENTERIAN DALAM NEGERI.
Project Completed Year 2010
Main Contractor SRJ BINA SDN BHD

51.
Project Title THE DESIGN, CONSTRUCTION, EQUIPPING COMMISSIONING AND MAINTENANCE OF KOLEJ KEJURURAWATAN KUALA PILAH, NEGERI SEMBILAN – PHASE 2.
Project Completed Year 2010
Main Contractor NS CONSTRUCTION SDN. BHD.

50.
Project Title CADANGAN PEMBANGUNAN PERUMAHAN DAN PENGINDAHAN PERSISIRAN SUNGAI KELANTAN ( ZON D ) YANG MENGANDUNGI BANGUNAN KEDAI DAN PEJABAT 3 TINGKAT JENIS “A” 384 UNIT DIATAS LOT PT379 – PT502, SEK.17, BANDAR KOTA BAHRU , KELANTAN.
Project Completed Year 2010
Main Contractor ELITE FORTE CONSTRUCTION SDN. BHD.

49.
Project Title CADANGAN MEMBINA DAN MENYIAPKAN 2 TINGKAT BANGUNAN PEJABAT TAMBAHAN (ANNEXE) DAN MENGUBAHSUAI, BANGUNAN 2 TINGKAT SEDIADA, DIATAS LOT 1552, KG JAYA INDUSTRIAL AREA MUKIM BATU, DAERAH GOMBAK UNTUK TETUAN TASEK CORPORATION BERHAD.
Project Completed Year 2010
Main Contractor DIAN MAKMUR SDN.BHD.

48.
Project Title KUALA LUMPUR GOLF & COUNTRY.
Project Completed Year 2009
Main Contractor JUTERAS VISION SDN.BHD.

47.
Project Title JALAN TUN RAZAK 20TH FLOOR SERVICE APARTMENT.
Project Completed Year 2009
Main Contractor YWC ENGINEERING & CONTRACTOR SDN.BHD.

46.
Project Title PUCHONG 16TH FLR SERVICE APARTMENT (1016 units).
Project Completed Year 2009
Main Contractor CONTRAMEC SDN.BHD.

45.
Project Title SIN CHEW DAILY EXISTING 2FLOOR OFFICE.
Project Completed Year 2008
Main Contractor YWC ENGINEERING & CONTRACTOR SDN.BHD.

44.
Project Title SUBANG USJ ONE AVENUE CONDOMINIUM PHASE 1 & PHASE 2.
Project Completed Year 2008
Main Contractor MODULER TECHNOLOGY CONSTRUCTION SDN.BHD.

43.
Project Title MID VALLY CITY DEVELOPMENT PHASE 2-PODIUM BLOCK THE GARDEN.
Project Completed Year 2007
Main Contractor SHIMIZU.

42.
Project Title 194 UNITS DOUBLE-STOREY TERRACE HOUSE, MUKIM TANJUNGDUA BELAS, DAERAH KUALA LANGAT, SELANGOR.
Project Completed Year 2006
Main Contractor MITC ENGINEERING SDN.BHD.

41.
Project Title JALAN ROBISON 20TH FLOOR SERVICE APARTMENT.
Project Completed Year 2006
Main Contractor MUTIARA JOHAN GROUP.

40.
Project Title 800 UNITS MEDIUM COSTAPARTMENT AT LOT 18337, MUKIM TANJUNGDUA BELAS,DAERAH KUALA LANGAT, SELANGOR.
Project Completed Year 2005
Main Contractor MITC ENGINEERING SDN.BHD.

39.
Project Title DESIGN, BUILD AND COMPLETE BUILDING AND INFRASTRUCTURE FOR   CADANGAN MEMBINA DAN MENYIAPKAN (PHASE A1) 28 OF 74 UNIT RUMAH BERKEMBAR 3 TINGKAT DAN 1 UNIT PENCAWANG ELETRICK DI ATAS PT43669-PT43742, SEBAHAGIAN LOT 13961, MUKIM DENGKIL, DAERAH SEPANG, SELANGOR DARUL EHSAN UNTUK ASTANA MODAL(M) SDN BHD
Project Completed Year 2004 - 2005
Main Contractor MITC ENGINEERING SDN.BHD.

38.
Project Title DESIGN, BUIL AND COMPLETE PHASE 1(122 UNITS SUPERLINK HOUSE) FOR PERMOHONAN KEBENARAN MERANCANG BAGI PINDAAN CADANGAN PELAN SUSUNATUR PEMBANGUNAN PERUMAHAN DAN PERNIAGAAN (PROJECK USAHASAMA) DIATAS SEBAHAGIAN LOT 13961, KAMPUNG RASAU, SELUAS 175.00 EKAR, MUKIM DENGKIL DAERAH SEPANG, SELANGOR DARUL EHSAN.
Project Completed Year 2004 - 2005
Main Contractor MITC ENGINEERING SDN.BHD.

37.
Project Title CADANGAN PEMBAGUNAN PUSAT REHABILITASI DI ATAS SEBAHAGIAN LOT PT7263 [HS (D) 18923], MUKIM DURIAN TUNGGAL, DAERAH ALOR GAJAH, MELAKA.
Project Completed Year 2004 - 2005
Main Contractor CCN CONSTRUCTION SDN.BHD.

36.
Project Title CADANGAN MEREKABENTUK, MEMBINA, MENYIAPKAN, MENGUJITERIMA, MENTUALAH DAN MENYELENGGARA INSTITUT KANSER NEGARA PUTRAJAYA.
Project Completed Year 2004 - 2005
Main Contractor GREAT SUCCESS CONSTRUCTION SDN.BHD.

35.
Project Title 4 UNITS 3 STOREY SEMI-D FACTORY, 20 UNITS 3 STOREY CLUSTER DETACHED FACTORY.
Project Completed Year 2004 - 2005
Main Contractor LBE BINA SDN.BHD.

34.
Project Title CADANGAN MEMBINA DAN MENYIAPKAN 33 UNITS RUMAH YANG TERDIRI DARI 11 UNITS RUMAH SESEBUAH 2 TINGKAT JENIS A, 13 UNIT RUMAH SESEBUAH JENIS B DAN 9 UNIT RUMAH SESEBUAH 2 TINGKAT JENIS C TERMASUK 1 UNIT PENCAWANG ELETRIK “SINGLE CHAMBER” DI ATAS SEBAHAGIAN LOT PTD 72263, EAST LEDANG, NUSAJAYA, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM.
Project Completed Year 2004 - 2005
Main Contractor TOTAL TEAMWORK CONSTRUCTION SDN.BHD.

33.
Project Title PROPOSED CONSTRUCTION, COMPLETION AND MAINTENANCE OF CIVIL, STRUCTURAL AND BUILDING WORKS FOR 12UNITS SEMI-D FACTORIES(SD40), 8UNITS SEMI-D FACTORIES(SD60A/SD60AC), 8UNITS SEMI-D FACTORIES(SD80) AT PHASE 1A, NUSA CEMERLANG INDUSTRIAL PARK, BANDAR NUSAJAYA, DAERAH JOHOR BAHRU, JOHOR D.T.
Project Completed Year 2004 - 2005
Main Contractor TIMOR JAYA CORPORATION SDN.BHD.

32.
Project Title CADANGAN MEMBINA DAN MENYIAPKAN 8 UNITS KEDAI/PEJABAT 3 TIMGKAT, DI ATAS LOT PT 1085-PT 1092, SEKSYEN 49, MUKIM LANGGAR, DAERAH KUBANG KERIAN, JAJAHAN KOTA BHARU, KELANTAN DARUL NAIM.
Project Completed Year 2004 - 2005
Main Contractor ELITE FORTE CONSTRUCTION SDN.BHD.

31.
Project Title CADANGAN MEMBINA DAN MENYIAPKAN 9 UNITS KEDAI/PEJABAT 3 TINGKAT, DI ATAS LOT 615,111,112 DAN 113 SEKSYEN 26, BANDAR KOTA BHARU, JAJAHAN KOTA BHARU, KELANTAN DARUL NAIM.
Project Completed Year 2004 - 2005
Main Contractor ELITE FORTE CONSTRUCTION SDN.BHD.

30.
Project Title CADANGAN PEMBANGUNAN PERUMAHAN DAN PENGINDAHAN PERSISIRAN SUNGAI KELANTAN (ZON A) YANG MENGANDUNGI BANGUNAN KEDAI DAN PEJABAT 3 TIMGKAT JENIS “A” 55 UNIT DIATAS LOT PT438-PT492, SEKSYEN 17, BANDAR KOTA BHARU, KELANTAN.
Project Completed Year 2004 - 2005
Main Contractor ELITE FORTE CONSTRUCTION SDN.BHD.

29.
Project Title PROPOSED CONSTRUCTION AND COMPLETION OF DOUBLE STOREY CLUSTER HOUSE TYPE C1; 8 UNITS OF THREE STOREY CLUSTER HOUSE TYPE C2; 16 UNITS OF THREE STOREY CLUSTER HOUSE TYPE C3; 16 UNITS OF THREE STOREY CLUSTER HOUSE TYPE C3A; 6 UNITS OF THREE STOREY SEMI-DETACHED HOUSE TYPE D1; 12 UNITS OF THREE STOREY SEMI-DETACHED HOUSE TYPE D; 1 UNIT OF DOUBLE CHAMBER TNB SUB-STATION; AT PHASE 9F, TAMAN DESA TEBRAU, MUKIM TEBRAU, JOHOR BHARU, JOHOR DARUL TAKZIM.
Project Completed Year 2004 - 2005
Main Contractor TOTAL TEAMWORK CONSTRUCTION SDN.BHD.

28.
Project Title CADANGAN MEMBINA DAN MENYIAPKAN RUMAH TERES 2 TINGKAT DAN 1 TINGKAT MUKIM BATU MENGKEBANG DAERAH KUALA KRAI KELANTAN DARUL IMAN.
Project Completed Year 2004 - 2005
Main Contractor ELITE FORTE CONSTRUCTION SDN.BHD.

27.
Project Title PROPOSED CONSTRUCTION, COMPLETION AND MAINTENANCE OF :-
  1. 21UNITS DOUBLE STOREY TERRANCE HOUSE, TYPE A(20’X65’),
  2. 22UNITS DOUBLE STOREY TERRANCE HOUSE,TYPE B (20’70’),
PHASE 1C, TAMAN DATO’ CHELLAM, MUKIM TEBRAU, DAERAH JOHOR BAHRU.
Project Completed Year 2004 - 2005
Main Contractor REPUTE CONSTRUCTION SDN.BHD.

26.
Project Title CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH SERVIS APARTMENT 23 TINGKAT YANG MENGANDUNGI 2 TINGKAT TEMPAT LETAK KERETE ARAS BAWAH TANAH, 4 TINGKAT TEMPAT LETAK KERETA DAN 19 TINGKAT YANG MENGANDUNGI 102 UNIT KEDIAMAN DI ATAS LOT 114 & PT 547, SEKSYEN 50, MUKIM BAYANG, KAMPUNG CHERANG, DAERAH PANJI, JAJAHAN KOTA BAHRU, KELANTAN.
Project Completed Year 2004 - 2005
Main Contractor ELITE FORTE CONSTRUCTION SDN.BHD.

25.
Project Title CADANGAN MEMBINA :
  1. 78UNIT RUMAH TERES JENIS A, 2 TINGKAT (20’X60’)(1450SQF) PLOT NO 1344-1382 DAN PLOT NO 1525-1563,
  2. 52UNIT RUMAH TERES JENIS B, 2 TINGKAT (20’X60’)(1350SQF) PLOT NO 1318-1343 DAN PLOT 1499-1524,
  3. 1 UNIT PENGCAWANG ELEKTRIK (DOUBLE CHAMBER PLOT 1576,
DI ATAS SEBAHAGIAN LOT PTD 71040, FASA 3B, PARCEL I-ONE (NUSA BAYU),BANDAR NUSAJAYA, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM.
Project Completed Year 2004 - 2005
Main Contractor PEMBINAAN DAFA SDN.BHD.

24.
Project Title 38 UNITS DOUBLE STOREY SEMI-D BANDAR SRI BOTANI, SIMPANG PULAI, PERAK.
Project Completed Year 2004 - 2005
Main Contractor HIGH RISE MILLEMMIUM SDN.BHD.

23.
Project Title DESIGN, BUILD AND COMPLETE BUILDING AND INFRASTRUCTURE FOR CADANGAN MEMBINA DAN MENYIAPKAN(PHASE A2,A3) 46 OF 74 UNIT RUMAH BERKEMBAR 3 TINGKAT DAN 1 UNIT PENCAWANG ELETRICK DI ATAS PT43669-PT43742, SEBAHAGIAN LOT 13961, MUKIM DENGKIL, DAERAH SEPANG, SELANGOR DARUL EHSAN UNTUK ASTANA MODAL(M) SDN BHD.
Project Completed Year 2004 - 2005
Main Contractor MITC ENGINEERING SDN BHD

22.
Project Title CADANGAN PEMBANGUNAN UNTUK MENYIAPKAN PUSAT REHABILITASI PERKESO TERMASUK KERJA-KERJA LUARAN DI ATAS LOT PT 7263(H.S.CD18923), MUKIM DARUAN TUNGGAL, ALOR GAJAH, HANG TUAH JAYA MELAKA UNTUK TETUAN PERTUBUHAN KESELAMATAN SOSIAL (PERKESO).
Project Completed Year 2004 - 2005
Main Contractor GREAT SUCCESS CONSTRUCTION SDN BHD

21.
Project Title 53UNITS OF SUPERLINK HOUSE FOR CADANGAN BARU PEMBANGUNAN 115 UNIT RUMAH JENIS ‘SUPERLINK’ 3 TINGKAT UNTUK FASA 2 YANG MENGANDUNGI 95 UNIT JENIS A  (24’ X 100’), 20 UNIT JENIS B (24’X80’) DAN SEBUAH BANGUNAN PENGCAWANG ELEKTRIK SERTA SEBUAH RUMAH PAM DI ATAS SEBAHAGIAN LOT 13961, MUKIM DENGKIL, DAERAH SEPANG, SELANGOR DARUL EHSAN.
Project Completed Year 2004 - 2005
Main Contractor MITC ENGINEERING SDN BHD

20.
Project Title PROPOSED BIOPHARMACEUTICAL MANUFACTURING FACILITY (PROJECT 1002) AT NUSAJAYA,JOHOR,MALAYSIA: INTERIOR & EXTERIOR WET WORKS AS PER TENDER PACKAGE C15A.
Project Completed Year 2004 - 2005
Main Contractor SPEED MANAGE SDN BHD

19.
Project Title CADANGAN MEMBINA 52 UNIT KEDAI-PEJABAT 4 TINGKAT 23’X70’ (BLOK B1,B2,B3 & B4) DAN 2 UNIT RUMAH SAMPAH DI ATAS SEBAHAGIAN LOT PT 7718, DI PERUNCIT 12, BANDAR SETIA ALAM, SEKSYEN U13, 40170 SHAH ALAM, SELANGOR DARUL EHSAN UNTUK TANJONG WAHYU SDN BHD.
Project Completed Year 2004 - 2005
Main Contractor YWC STRUCTURE SDN BHD

18.
Project Title CADANGAN MEMBINA FASA 1 (BLOK C1,C2,D1,D2,C3,C4,D3,D4) :-
  1. 94UNIT KEDAI – PEJABAT 4 TINGKAT 23’X70’,
  2. 3 UNIT PENCAWANG ELETRIK ‘DOUBLE CHAMBER’ ,
  3. 1 UNIT RUMAH SAMPAH
DI PERUNCIT 12, BANDAR SETIA ALAM, SELANGOR DARUL EHSAN UNTUK TANJONG WAHYU SDN BHD.
Project Completed Year 2004 - 2005
Main Contractor YWC STRUCTURES SDN BHD

17.
Project Title 60 UNITS OF SUPERLINK HOUSE FOR CADANGAN BARU PEMBANGUNAN 115 UNIT RUMAH JENIS ‘SUPERLINK’ 3 TINGKAT UNTUK FASA 2 YANG MENGANDUNGI 95 UNIT JENIS A  (24’ X 100’), 20 UNIT JENIS B (24’X80’) DAN SEBUAH BANGUNAN PENGCAWANG ELEKTRIK SERTA SEBUAH RUMAH PAM DI ATAS SEBAHAGIAN LOT 13961, MUKIM DENGKIL, DAERAH SEPANG, SELANGOR DARUL EHSAN.
Project Completed Year 2004 - 2005
Main Contractor MITC ENGINEERING SDN BHD

16.
Project Title CADANGAN MEMBINA 75 UNIT KEDAI-PEJABAT 4 TINGKAT 23’X70’ (BLOK A1,A2,A3,A4,A5,A6) DENGAN 1 TINGKAT SUB-BESMEN DAN 1UNIT PENCAWANG ELEKTRIK’DOUBLE CHAMBER’ DAN 1UNIT RUMAH SAMPAH DI ATAS SEBAHAGIAN LOT PT 7718, DI PERUNCIT 12, BANDAR SETIA ALAM, SEKSYEN U13, 40170 SHAH ALAM, SELANGOR DARUL EHSAN UNTUK TANJONG WAHYU SDN BHD.
Project Completed Year 2004 - 2005
Main Contractor YWC STRUCTURE SDN.BHD.

15.
Project Title CADANGAN MEMBINA 52UNIT RUMAH TERES (20’X70’) SERTA 1 UNIT PONDOK PENGAWAL DIATAS LOT 23683 (8.844 EKAR),MUKIM SUNGAI BULOH,DAERAH PETALING,SELANGOR DARUL EHSANUNTUK TETUAN LAMAN BAYU SDN BHD.
Project Completed Year 2004 - 2005
Main Contractor MAXPROM BINA SDN BHD

14.
Project Title CADANGAN MEROBOH DAN MEMBINA SEMULA SEBUAH RUMAH BANGLO 3 TINGKAT DENGAN 2 TINGKAT ARAS BAWAH TANAH BERSERTA SEBUAH KOLAM RENANG DI ATAS LOT 37902 & 37903 PERSIARAN NEGERI SEMBILAN UNTUK TETUAN TAN SRI DATO YAP SUAN.
Project Completed Year 2004 - 2005
Main Contractor MAXPROM BINA SDN BHD.

13.
Project Title CADANGAN PEMBANGUNAN PERUMAHAN YANG MENGANDUNGI:
  1. RUMAH BANDAR KOS SEDRHANA 2 TINGKAT (2 UNIT/LOT) (24’X60’-65’) – 10 UNIT
  2. RUMAH BERKEMBAR 3 TINGKAT(42’X84’) – 8 UNIT (C) RUMAH BERKEMBAR 3 TINGKAT(42’X91’) – 8 UNIT
DI ATAS LOT PT 33958-33978 (LOT 229-238 & 402-405), DI MUKIM SEMENYIH, DAERAH HULU LANGAT, SELANGOR.
Project Completed Year 2004 - 2005
Main Contractor HIGH RISE MILLENNIUM SDN. BHD.

12.
Project Title CADANGAN PEMBANGUNAN 23 UNIT KILANG YANG MENGANDUNGI:
  1. 1 UNIT KILANG SESEBUAH 2 TINGKAT DAN 22 UNIT KILANG BERKEMBAR 2 TINGKAT MERANGKUMI RUANG KILANG DI TINGKAT BAWAH DAN RUANG PEJABAT DI TINGKAT SATU.
  2. 1 UNIT PENCAWANG ELEKTRIK ‘SINGLE CHAMBER’, 1 UNIT PENCAWANG ELEKTRIK ‘DOUBLE CHAMBER’ DAN 1 UNIT PENCAWANG ELEKTRIK ‘COMPACT SUB’.
DI ATAS LOT 1949, MUKIM SEMENYIH, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN UNTUK TETUAN LGK LAND SDN. BHD.
Project Completed Year 2004 - 2005
Main Contractor HIGH RISE MILLENNIUM SDN. BHD.

11.
Project Title 63 UNITS BANGALOW AT EAST LEDANG PHASE 4B1 & 4B2, JOHOR FOR UEM LAND BHD.
Project Completed Year 2004 - 2005
Main Contractor TOTAL TEAMWORK SDN BHD

10.
Project Title CADANGAN MEMBINA DAN MENYIAPKAN 6 UNIT RUMAH BANGLO 3 TINGKAT (JENIS C1, C2, C3), 20 UNIT RUMAH BERKEMBAR 3 TINGKAT (JENIS A1, A2, A3) DAN 20 UNIT RUMAH BERKEMBAR 3 TINGKAT (JENIS B1, B2, B3) DI ATAS LOT PT 37343 (43875) – PT 37392 (43924) DI BANDAR BUKIT PUCHONG 2, MUKIM DENGKIL, DAERAH SEPANG, SELANGOR DARUL EHSAN UNTUK TETUAN BUKIT HITAM DEVELOPMENT SDN BHD.
Project Completed Year 2004 - 2005
Main Contractor HIGH RISE MILLENNIUM SDN. BHD.

9.
Project Title PROPOSED CONSTRUCTION AND COMPLETION OF 6 BLOCKS (117 UNITS ) OF 3 STOREY TOWNHOUSES (STRATA TITLE) WITH SEMI-BASEMENT CAR PARK CONSISTING OF :
  1. 39UNITS OF TYPE A,
  2. 39 UNITS OF TYPE B,
  3. 39 UNITS OF TYPE C,
1 UNIT OF MANAGEMENT OFFICE, 1 UNIT OF GUARD HOUSE, 1 UNIT DOUBLE CHAMBER TNB SUB-STATION, 1 UNIT BIN CENTRE, INCLUDING EXTERNAL INFRASTRUCTURAL,LANDSCAPING AND OTHES RELATED WORKS ON LOT PTD 170644, PHASE 9, EAST LEDANG, NUSAJAYA, MUKIM PULAI, DAERAH JOHOR BAHRU,JOHOR DARUL TAKZIM FOR UEM LAND BERHAD.
Project Completed Year 2004 - 2005
Main Contractor TOTAL TEAMWORK SDN BHD

8.
Project Title CADANGAN PEMBANGUNAN 2 BLOK PANGSAPURI (360 UNIT) DI ATAS 4 TINGKAT PODIUM TEMPAT LETAK KERETA YANG MENGANDUNGI:-
  1. BLOK A – PANGSAPURI 23 TINGKAT (176 UNIT) DENGAN KEMUDAHAN –KEMUDAHAN ASAS DI TINGKAT BAWAH
  2. BLOK B – PANGSAPURI 22 DAN 24 TINGKAT (184 UNIT) 3) 1 TINGKAT SUB-BASEMEN TEMPAT LETAK KERETA
DI ATAS LOT PT 5746, MUKIM SETAPAK, WILAYAH PERSEKUTUAN, KUALA LUMPUR, UNTUK TETUAN ARUS EMBUN SDN. BHD.
Project Completed Year 2004 - 2005
Main Contractor COMFORT PLUS SDN BHD

7.
Project Title CADANGAN PEMBANGUNAN 2 BLOK PERNIAGAAN (396 UNIT) YANG MENGANDUNGI:
  1. BLOK A: SUITE PEJABAT (182 UNIT) 17 TINGKAT,
  2. BLOK B: SUITE PEJABAT (209 UNIT) 14TINGKAT,
  3. KEDAI BERSTRATA (5 UNIT) 1 ½ TINGKAT DI ARAS TINGKAT BAWAH,
  4. 6 TINGKAT TEMPAT LETAK KERETA ATAS PODIUM,
  5. KEMUDAHAN PEKREASI (SEPERTI KOLAM RENANG, GYMNASIUM, SAUNA DLL)
DI ARAS 6 (PODIUM) DAN ARAS 17 BLOK A, F) KAWASAN LANDSKAP DI ATAS PODIUM DAN ARAS 17 BLOK A BESERTA 2 UNIT PENCAWANG ELEKTRIK DI ATAS LOT PT9453, JALAN MAKMUR, TAMAN SRI GOMBAK, BANDAR SELAYANG, DAERAH GOMBAK, SELANGOR DARUL EHSAN UNTUK TETUAN RADIANT SYMPHONY SDN BHD.
Project Completed Year 2004 - 2005
Main Contractor YWC STRUCTURES SDN BHD

6.
Project Title CADANGAN PEMBANGUNAN 1 BLOK PANGSAPURI 25 TINGKAT (95 UNIT) YANG MENGANDUNGI 1 TINGKAT SEPARA BASEMEN, KEMUDAHAN-KEMUDAHAN PENDUDUK, 3 TINGKAT BASEMEN, TEMPAT LETAK KERETA, 1 UNIT PENCAWANG ELEKTRIK . 1 UNIT PONDOK PENGAWAL DAN 1 UNIT TEMPAT PENGUMPULAN SAMPAH DI ATAS PT25735, JALAN 1/62A, BANDAR MANJALARA MUKIM BATU, KUALA LUMPUR UNTUK TETUAN RADIANT SYMPHONY SDN BHD.
Project Completed Year 2004 - 2005
Main Contractor YWC STRUCTURES SDN BHD

5.
Project Title CADANGAN MEMBINA 18 UNIT 4 TINGKAT KEDAI PEJABAT BERSERTA DAN 2 BLOK 360 UNIT 22 TINGKAT PANGSAPURI SERVIS TERMASUK 5 TINGKAT LETAK KERETA BERTINGKAT DAN KEMUDAHAN-KEMUDAHAN PENDUDUK SEPERTI PEJABAT PENGURUSAN, DEWAN SERBAGUNA, TADIKA, SURAU DAN GIMNASIUM DI ATAS SEBAHAGIAN LOT 46890, MUKIM BATU, DAERAH GOMBAK, MAJLIS PERBANDARAN SELAYANG, BANDAR BARU SELAYANG UNTUK SELAYANG 18 SDN BHD.
Project Completed Year 2004 - 2005
Main Contractor YWC STRUCTURES SDN BHD

4.
Project Title CADANGAN MEMBINA 4 BLOK PANGSAPURI KOS SEDERHANA 8 TINGKAT (416 UNIT) DAN 2 TINGKAT TEMPAT LETAK KERETA DI ATAS PT 2685, KAMPUNG RAJA, MUKIM ULU TELOM, DAERAH CAMERON HIGHLAND, PAHANG DARUL MAKMUR
Project Completed Year 2004 - 2005
Main Contractor ELITE FORTE CONSTRUCTION SDN BHD

3.
Project Title CADANGAN MENDIRIKAN 1 BLOK 419 UNIT PANGSAPURI PERKHIDMATAN 22 TINGKAT (BLOK ‘O’) YANG MENGANDUNGI :-
  1. 1 TINGKAT KEDAI, PASARAYA DAN KOMPLEK MAKANAN SETEMPAT DI TINGKAT BAWAH
  2. 5 TINGKAT PODIUM TEMPAT LETAK KERETA DARI TINGKAT 1 HINGGA TINGKAT 5
  3. 1 TINGKAT KEMUDAHAN AWAM DI TINGKAT 6
  4. 15 TINGKAT PANGSAPURI PERKHIDMATAN DARI TINGKAT 7 HINGGA TINGKAT 21 SERTA 1 BLOK BANGUNAN PODIUM TEMPAT LETAK KERETA 5 TINGKAT
DI ATAS LOT 18052 – 18056 TAMAN MAS SEPANG, MUKIM DENGKIL, DAERAH SEPANG SELANGOR D.E UNTUK MESSRS MASTERON SDN BHD
Project Completed Year 2004 - 2005
Main Contractor YWC STRUCTURES SDN BHD

2.
Project Title CADANG PEMBANGUNAN 2 BLOK PANGSAPURI (360 UNIT) DI ATAS 4 TINGKAT PODIUM TEMPAT LETAK KERETA YANG MENGANDUNGI:-
  1. BLOK A - PANGSAPURI 23 TINGKAT BAWAH.
  2. BLOK B: SUITE PEJABAT (209 UNIT) 14TINGKAT,
  3. 1 TINGKAT SUB-BASEMEN TEMPAT LETAK KERETA
DI ATAS LOT PT 5746, MUKIM SETAPAK, WILAYAH PERSEKUTUAN, KUALA LUMPUR, UNTUK TETUAN ARUS EMBUN SDN BHD.
Project Completed Year 2004 - 2005
Main Contractor COMFORT PLUS SDN BHD

1.
Project Title PROPOSED CONSTRUCTION & COMPLETION OF 134 UNITS OF DOUBLE STOREY TERRACE HOUSES ON PT 201664 - PT 201738, PT201744 - PT 201790, PT 201791/PT 32301 - PT 201802/PT 32312 AT PART OF PARCEL F, BANDAR SERI BOTANI, OFF JALAN GOPENG, IPOH.
Project Completed Year 2004 - 2005
Main Contractor HIGH RISE MILLENNIUM.

Switch To Desktop Version